Made in Türkiye  ·  Exporting PPR, HDPE & UPVC piping systems to 118+ countries
Home Project Supply
Piping projects worldwide

Piping Supply Scenarios for Projects and Distribution

Compare supply plans for construction, distribution, outdoor water networks and private-label orders. These scenarios explain product selection, documents and commercial terms. Confirm the final scope with the export team against your bill of materials and destination requirements.

30+ Years 118+ Countries SKZ · ISO · CE · WRAS 120,000 m² · 10,000 molds

Bekaatherm supplies piping systems wholesale to importers, distributors, contractors and OEM brands, not single-item retail.

Our track record

Delivery, On Spec and On Time, in Numbers

Before placing a piping order, match the product range, pressure duty, batch documentation and delivery plan to your project. Use the factory, quality-control and product pages to review the capabilities behind a quotation. Request the documents applicable to the exact products and destination in your order.

Track recordValueWhy it matters to a project buyer
Years manufacturing PPR / PE / PP30+ yearsMature, repeatable process control, not a first-time exporter learning on your order
Countries supplied118+ countriesExport documentation and container logistics already proven into your region
CertificationSKZ · ISO 15874 · CE · WRASClears customs, passes inspection and satisfies clean-water approval
Manufacturing footprint120,000 m² · 10,000 molds · 1000+ staffAbsorbs multi-container project volume while holding batch consistency
Raw material100% high-grade resinNo regrind or filler, the pressure rating on the label is the pressure you get
Order-specific documentationAvailable on requestConfirm the required documents and supply scope with the export team
By region & application

Compare Supply Scenarios by Region & Application

The four supply scenarios below cover an importer building a local product range, a contractor sourcing a building package, an outdoor water-network order and a private-label programme. Each scenario links to the relevant product or buyer page so you can prepare an enquiry with a defined scope.

Forklift loading palletised Bekaatherm cartons and pipe coils into an export container
Importers & distributors

MENA Distribution

PPR pipe, fittings and valves, the full range for a national catalogue across the Middle East and North Africa, with certification that clears customs and batch consistency that holds across reorders.

One 20GP mixed container to start
Green PPR fittings and valves set, unions, angled tee and ball valve
Contractors & project buyers

Residential & Commercial

Project-grade PPR hot & cold water systems at the correct PN ratings, with a full technical document pack for inspection and scheduled delivery to site.

PN20 / PN25 · phased to your programme
Blue PP compression coupling for HDPE pipe
Utilities & infrastructure

Municipal & Utility

HDPE / HDPE / PP compression systems for outdoor water supply and municipal networks, PN10, weld-free mechanical connection installed without fusion equipment on site.

PN10 · no fusion equipment on site
White Bekaatherm PPR-AL-PPR pipe, cut end showing the aluminium middle layer
Brands & private label

OEM & Private Label

Full OEM production, custom color and branding across the green / white / coffee series, with regional exclusivity protecting a brand partner’s territory.

One 40HQ, or 3 t per colour, first run
Project categoryWho it’s forWhat we supplyEntry order & lead timeSolution page
MENA Distribution PartnershipsImporters & distributorsPPR pipe, fittings, valves, full range for a national catalogueOne 20GP mixed container · 15–25 days on regular sizesFor Importers & Distributors
Residential & Commercial BuildingsContractors & project buyersProject-grade PPR hot & cold water systems, correct PN ratingsPriced from your BOM · phased against pour and handover datesFor Projects & Contractors
Municipal & Utility Water NetworksUtilities & infrastructure buyersHDPE pipe with PP compression fittings, PN10, for outdoor & municipal supply500 kg per size and colour · 15–25 days on regular sizesHDPE Pipe & Fittings
OEM & Private Label PartnershipsBrands & private-label ownersFull OEM production, custom colour & branding, regional exclusivityOne 40HQ, or 3 tonnes per colour on a first branded run · 30–45 daysOEM & Private Label
What we ship on a project

The Real Systems Behind Each Supply Plan

A project quotation starts with the product schedule. Compare the systems, dimensions, pressure classes and article numbers below with your bill of materials, then confirm the available specifications and documentation for the selected items.

PPR pipe, six structures, six sizes, two pressure classes (OD × wall, mm)

OD (mm)PPR plain PN20PPR plain PN25PPR-AL-PPR PN20PPR-AL-PPR PN25PPR fiberglass PN20PPR fiberglass PN25
2020×2.820×3.420×3.120×3.420×2.820×3.4
2525×3.525×4.225×3.325×4.225×3.525×4.2
3232×4.432×5.432×4.132×5.432×4.432×5.4
4040×5.540×6.740×5.040×6.740×5.540×6.7
5050×6.950×8.450×5.550×8.450×6.950×8.4
6363×8.663×10.563×7.063×10.563×8.663×10.5

Article numbers, PPR plain PN20 BK-001–006, PN25 BK-007–012; PPR-AL-PPR PN20 BK-01–06, PN25 BK-07–12; fiberglass PN20 BK-13–18, PN25 BK-19–24. Colour series: green / white / coffee. Larger diameters, coil lengths and packing on request.

Fittings, valves & manifolds, the matched, brass-core range

Component groupArticle numbersSize rangeNotes
Elbow 90° / 45°BK-25–30 · BK-61–6620–63 mmSame resin and colour as the pipe
Socket · Tee · End CapBK-31–36 · BK-37–42 · BK-49–5420–63 mmPlus reduce socket & reduce tee for transitions
Female / Male threaded fittingsBK-114–15320–63 mm × 1/2″–2″Brass insert, socket / elbow / tee variants
Unions & brass double-unionBK-100–105 · BK-162–18120–63 mmPlastic and brass, female & male thread
Stop / brass / ball valvesBK-182–20520–63 mmBrass core throughout
Manifolds (2–5 way)BK-206–21932/40 × 1/2″FUnderfloor & radiator distribution
Radiator & solar setsBK-257–28220/25 × 1/2″–3/4″Straight / angle radiator valves

Outdoor & drainage systems on a full development

HDPE / PP compression fittingsPN10 · weld-free
RangeMale / female / reduce socket · tee · elbow · cap
Valves & clampsCompression ball valve · saddle clamp PN10
ApplicationOutdoor supply · irrigation · municipal
UPVC drainage / soilLow-noise · ring-seal
Pipe wallTYPE1 s=3–3.9 mm · TYPE2 s=1.8–3.2 mm
Diameter rangeDN 50–200 mm
FittingsElbow 45°/87° · single/double branch · siphon

Pressure classes: PPR PN20 (20 bar @ 20 °C) and PN25 (25 bar); HDPE / PP compression PN10. Exact diameters, weights, packing and pricing for your bill of materials are confirmed on enquiry, available on request.

The range in the box

What Lands in the Container

The supply plans draw on the product range shown below. Match the required fittings, valves and pipe to your distribution stock list or construction schedule, then confirm the specification and packaging for the order.

Where projects live

One System, Every Part of the Building

A coordinated order can include indoor PPR water supply, the outdoor PE network and UPVC drainage. Each system still requires its own application check, pressure or drainage specification, and supporting documentation. The scenarios below help define those checks before quotation.

Green series Bekaatherm PPR pipe
In-wall supplyPPR PN20 · hot & cold water
White PPR pipe assembly with tee and elbow fittings
Ceiling distributionRisers & branch lines
White PPR angle stop valve connecting a radiator
Radiator heatingPN25 · brass-core valves
Supply scenario

Regional Distribution Supply Standard

An importer opening a new PPR line is not buying pipe, they are buying the certainty that year three still looks like year one. Rather than tell you a story about a distributor we cannot name, here is the standard every distribution partner is supplied against, and the commercial terms we will confirm in writing on your first enquiry.

Buyer profileImporter / regional distributor
Product systems suppliedPPR pipe · PPR fittings · brass-core valves · manifolds
Trial orderOne 20GP mixed container (pipe + fittings + valves)
Container model20GP roughly 33 m³ usable against a ~28 tonne payload · 40HQ roughly 76 m³
Lead time15–25 days on regular in-production sizes
TermsFOB İstanbul / Mersin or the allocated Chinese port, per the origin assigned to your market · 30% T/T deposit, 70% against copy B/L
What we commit toReorders held to the original batch colour reference · full certificate pack per shipment · written regional exclusivity
  • The challenge every importer shares: a container held at the port over a certificate the authority does not recognise, a factory that runs short in peak season, and the quiet fear that the supplier will one day sell direct to the customers you spent three years building.
  • What we put against it: SKZ, CE and WRAS certificates plus the full export document pack with every consignment; 15–25 day reorder lead times backed by a 120,000 m² plant; and regional exclusivity agreed in writing per market, so we supply through you rather than around you.
  • Verify the proposed order with product documents, samples and agreed inspection requirements. For branded samples, allow 7–10 days under the standard sample policy and confirm the selected colours and markings before production.
Green PPR pipe run installed on a building site
Heat-fusion welding tool joining white PPR pipe on site
Supply scenario

Building Supply Delivery Standard

For a building order, match each piping duty to the operating pressure and temperature, the project inspection requirements and the installation schedule. Confirm the product documents and delivery dates against the final bill of materials.

Buyer profileMain contractor · MEP subcontractor · project procurement
Product systems suppliedPPR hot & cold water system · matched fittings, valves & manifolds
Pressure classesPN20 on cold and distribution · PN25 on hot and recirculation
Design life50-year design life at rated pressure and 20 °C under ISO 15874
Lead time15–25 days on regular in-production sizes, phased to your milestone dates
Document packTDS · SKZ / CE / WRAS certificates · pressure-test reports, per consignment
What we commit toOne batch reference across the order where volume allows, and top-up orders run against it · 50-year warranty against material and manufacturing defects, backed by batch traceability and retained test records
  • The challenge every project buyer shares: a pressure class that is adequate on paper but marginal in service, visible colour drift between blocks delivered a month apart, a document file too thin to pass the consultant, and a delivery that slips and stalls every trade behind it.
  • What we put against it: PN selection matched duty by duty with engineering support, production held to one batch reference so floor 3 and floor 30 match, a full inspection pack prepared before the container ships, and a schedule built backwards from your pour and handover dates.
  • How you verify it before ordering: send us the BOM and check the schedule we return line by line, request third-party pressure and dimensional reports on your own batch, and audit the plant in person or on video before you commit.
Supply scenario

OEM & Private Label Programme Terms

A private-label order needs written agreement on branding, colours, packaging, minimum quantities and any regional exclusivity. The terms below provide a starting point for that agreement and should be confirmed for the first branded production run.

Buyer profileBrand owner / private-label distributor
Product systems suppliedPPR pipe & fittings in the green / white / coffee series
OEM scopeCustom colour · logo print · packaging & carton artwork
First branded runOne 40HQ, or 3 tonnes per colour
Lead time30–45 days, plus 7–10 days on a first colour match or new tooling
Branded samples7–10 days; sample cost credited against the first bulk order
TerritoryRegional exclusivity available to private-label partners, agreed in writing per market
  • The challenge every brand owner shares: your name goes on a product made in a factory you do not control, so a quality slip is your reputation, not ours, and the worst case is a supplier who learns your market and then sells into it directly.
  • What we put against it: production on dedicated tooling from 100% high-grade resin under SKZ, CE and WRAS certification, colour matched and held across runs, and regional exclusivity committed in writing per market before the first branded container ships.
  • Verify the proposed order with product documents, samples and agreed inspection requirements. For branded samples, allow 7–10 days under the standard sample policy and confirm the selected colours and markings before production.
Bekaatherm coffee-series PPR fittings laid out for OEM and private-label branding
Proof behind every project

The Track Record Behind Every Project

Even before you read a single named case, the fundamentals tell you whether a supplier can carry your project. Bekaatherm brings 30 years of PPR, PE and PP manufacturing, a 120,000 m² facility with 10,000 molds and 1000+ staff to absorb project-scale volume, the strictest certification in the industry, and a proven route into 118+ countries.

Proof pointWhat it means for your project
30+ years manufacturingMature process control, not a first-time exporter learning on your order
118+ countries exportedEstablished export docs, container loading & logistics for your region
SKZ · ISO 15874 · CE · WRASCertification your project needs for customs, inspection & clean-water approval (certificate no. available on request)
120,000 m² · 10,000 molds · 1000+ staffCapacity to hold batch consistency across a large, multi-container project
100% high-grade resinRated pressure is real pressure, no regrind or filler to fail on site
OEM supported · regional exclusivity offeredBrand partners get their own color/branding and a protected territory
30+
Years
120,000 m²
Plant
1000+
Staff
10,000
Molds
118+
Countries
100%
Grade resin
24h
Support

Certificate numbers and copies are available on request.

How a project runs

From First Enquiry to Delivered Container

Use this enquiry-to-delivery sequence to agree the product schedule, documents, sample approval, production and loading plan. Confirm dates and responsibilities in the written order.

1 · Scope & BOM

Send the project type, systems, pressure and temperature requirements, destination and volume. The export team can use that schedule to prepare an order-specific proposal.

2 · Spec & docs

Correct PN and structure selected with engineering support, plus the technical document pack, TDS and SKZ/CE/WRAS certificates.

3 · Production

Molded on dedicated tooling from 100% high-grade resin, with batch consistency held across a multi-container run.

4 · QC & test

Pressure and dimensional checks before packing, with test reports available for inspection and sign-off.

5 · Load & ship

Container-load optimized and documented for your region, export paperwork proven across 118+ countries.

Order verification

Four Checks Before an Order

Use these four checks to review an order before approval. Request the product documents and samples, agree batch-inspection requirements, and discuss a factory review with the export team. Confirm availability, scope and timing in writing for your order.

Product-specific documentation

Request the technical file for the selected products, including the applicable standard edition, product approval scope, dimensions and pressure-duty information. Agree the documents required by your project or destination authority before order approval.

A factory audit, live

Walk the extrusion lines, the moulding hall and the test lab yourself, or have us do it live on video against your own checklist. Third-party inspection agencies are welcome on your behalf.

Test reports on your batch

Pressure, dimensional and material reports for the goods you are actually buying, plus SKZ, CE and WRAS certificates with numbers and copies, not a generic sample from an old file.

A sample, then a trial container

Standard samples free (up to 3 items), freight collect; branded samples in 7–10 days with the cost credited against your first bulk order. Then prove us on one 20GP mixed container.

One supplier, every system

Whatever Your Project Needs, From One Supplier

Most of our projects draw on more than one system, a building job needs PPR pipe plus fittings, valves and manifolds; a utility job needs HDPE / PP compression fittings; a full development adds UPVC drainage. Sourcing them all from one certified Turkish manufacturer means one set of documents, matched material and color, and one point of accountability. Explore the systems behind our projects:

FAQ

Project Supply, Frequently Asked Questions

What evidence should I review before approving this supply plan?

For an importer, define the destination market and product range first. Use the proposal to check the relevant product documents, quantities, reorder requirements and delivery terms before placing the order.

For a contractor, provide the project product schedule and operating duty. Check the proposed PN class, fittings, inspection documents and phased delivery dates with the responsible project engineer.

Which documents and samples should I request?

For a distributor, request product-specific technical documents and samples, agree batch inspection requirements, and discuss a factory review with the export team. The response policy is 24 hours. Confirm separately the timing of samples, inspections and any visit.

What scale of project can you handle?

For the Project Buyer: Project scale is no constraint, a 120,000 m² facility, 10,000 molds and 1000+ staff absorb multi-container project volumes while holding batch consistency. Exact capacity and lead time for your volume are confirmed on your enquiry (available on request).

How should I agree private-label terms?

For a brand owner, agree colours, logos, packaging, minimum quantities and any regional exclusivity in writing. Branded samples take 7–10 days under the standard sample policy, with the sample cost credited against the first bulk order.

Which systems and sizes can a single project draw on?

For the Contractor: A single Bekaatherm project can combine PPR pipe (20–63 mm, PN20/PN25) in plain, fiberglass and aluminium-composite structures, the full matched brass-core fittings and valve range, HDPE / PP compression fittings at PN10 for the outdoor network, and UPVC drainage DN 50–200 mm, all from one supplier, one document set and one point of accountability.

What documentation ships with a project order?

For the Project Buyer: Every project order can be accompanied by technical data sheets, SKZ / ISO / CE / WRAS certificates and pressure-test reports for inspection and sign-off. For the Importer: the same certification is what clears customs and lets you list a compliant range in your market. Certificate numbers and copies are available on request.

Explore the cluster

Do Your Due Diligence, The Full Picture

Continue with the buyer page for your order type, then review the product range, quality-control process, manufacturing capability and export terms needed for a complete enquiry.

Let’s Talk About Your Project

Tell us the destination, order type, required systems and volume. Request an order-specific proposal covering the product schedule, applicable documentation, pricing and delivery terms.

Explore further: For Projects & Contractors · Global Export & Logistics · Certifications · OEM & Private Label