Made in Türkiye  ·  Exporting PPR, HDPE & UPVC piping systems to 118+ countries
Home Blog Installation & Commissioning
Installation & commissioning

Installation, Pressure Testing & Commissioning

Socket fusion temperatures and dwell times, thermal expansion and clip spacing, in-wall chasing, pressure test procedures to EN 806-4, and the joints that fail on site.

9 guides SKZ / ISO / CE / WRAS Exporting to 118+ countries
Butt-fused black HDPE mains pipework with blue potable stripes, elbows and straight runs joined face to face
Installation & Commissioning

Choosing an HDPE Butt Fusion Machine: Clamp Range, Pressure Control and What Rental Units Get Wrong

An HDPE pipe welding machine of the butt fusion type is sold by one number: the outside-diameter band its clamps cover. Three published examples show the…

Read the guide
Racked Bekaatherm pipe bundles and palletised fittings in the export warehouse, stock staged for HDPE pipe jointing orders
Installation & Commissioning

HDPE Pipe Jointing Methods Compared: Butt Fusion, Electrofusion and Compression

HDPE pipe jointing looks like an installation decision. The welder in the trench treats it as one. In practice the choice is made much earlier. It…

Read the guide
Green PPR pipe installed in a wall for hot and cold water supply
Installation & Commissioning

Chasing, Embedding and In-Wall PPR: Doing It So It Never Leaks

The moment before the plasterer arrives is the last time anyone will see these joints. BS EN 806-4 clause 3.2.5 says what has to happen first.…

Read the guide
UPVC floor drain and trap detail, illustrative placeholder
Installation & Commissioning

Repairing a Damaged PPR Line Without Draining the Building

Search for a pipe repair coupling and almost everything you find was written for PVC or copper: a slip coupling that telescopes over the break, a…

Read the guide
Brass-core valve, ISO & CE conformity
Installation & Commissioning

Pressure Testing and Commissioning a PPR System

A PN20 pipe is not tested at 30 bar. That single sentence contradicts most of what the first page of Google says about pressure testing PPR,…

Read the guide
Heat-fused PPR pipe joint being welded on site with a socket fusion tool
Installation & Commissioning

Cold-Weather Installation: Fusion Below 5°C and What Changes

Ask five installers what happens to PP-R socket fusion below 5 °C and you will get two wrong answers: stop work, or turn the iron up. One…

Read the guide
UPVC siphon and non-return valve, illustrative placeholder
Installation & Commissioning

Pipe Clamps and Support Spacing: The Table Installers Actually Need

Under the US model plumbing code, a horizontal PVC pipe clamp goes every 4 ft (1.22 m), and a vertical one every 10 ft. That is…

Read the guide
PPR pipe run in a ceiling void for HVAC and chilled water
Installation & Commissioning

PPR Thermal Expansion: Support Spacing and Expansion Loops

Every clip in this picture is a decision. Which ones hold the pipe still and which ones let it slide is what determines whether the run…

Read the guide
PPR pipe extrusion line, the certified production process SKZ continuously audits
Installation & Commissioning

Socket Fusion Faults: 8 Joints That Fail and How to Spot Them

A socket pipe joint takes about eight seconds to make and lasts as long as the building does. The uncomfortable part, backed by peer-reviewed work on…

Read the guide